Rvrbrbrvrb
Nuclear items are identified by the material management code
"CM" (nuclear ordinance material) prefixed to the national stock number (NSN)
"CM" suffixed to the NSN
"NM" (nonexplosive material) suffixed to the NSN
"NM" prefixed to the NSN
Which parts or components are funded, procured, and owned by the Air Force?
Base Spares
Military Spares
Department of Energy (DOE) spares
Major Command (MAJCOM) spares
Which parts or components are furnished to the Air Force but remain the property of Department of Energy (DOE) regardless of custody?
Weapon storage vaults
Clip-in assemblies
Practice bombs
Group-X kits
The "X" in the expendability, recoverability, repairability, category (ERRC) code "XB3" means the item is
Expendable
Nonexpendable
Repairable
Nonrepairable
What agency controls the unit spares authorization list items?
Nuclear Control Point
Nuclear Certification Division
Nuclear Systems Integration Branch
San Antonio Air Logistics Service Center
If units require a change to authorized unit spares authorization list items?
Nuclear Weapons Center
Department of Defense
Department of Energy
Major Command
Who develops and published local procedures to ensure proper control, protection, accountability, and reporting of weapons, major assemblies, and related components
Munitions accountable systems officer (MASO)
Maintenance superintendent
Senior technical advisor
Unit Commander
Which procedure is not performed during the stockpile emergency verification (SEV)?
Physical serial number verification
Inventory of saddlebags and accessories
Reconciliation with the weapons custody list
Physical weapon count with accountable records
Phase 1 actions of a stockpile emergency verification (SEV) can be a physical verification or
A records check verification
A handling gear verification
An associated equipment check
An unassociated equipment check
How often does the Defense Threat Reduction Agency (DTRA) provide field units location inventory listings?
Weekly
Monthly
Annualy
Biannually
The location inventory listing (LIL) is extracted from the consolidated nuclear weapons database at
Headquarters United States Air Force (HQ USAF)
The Nuclear Control Point (NCP)
Defense Threat Reduction Agency (DTRA)
The major command (MAJCOM)
Which actions do not require you to update the location inventory listing (LIL)?
Receipt
Shipment
Parachute replacement
Limited life component exchange (LLCE)
Who has temporary custody of the weapons and grants access to the immediate area where the weapons are located?
Anyone in the weapons storage area
Weapons transfer agent
Weapon load supervisor
Sole vouching authority (SVA)
Taking control of a weapon from another individual or relinquishing control of the weapon to another person is known as
Custody transfer
Custody recontrol
Command and control
Command relinquishment
What form does the transporting and mating supervisor sign to accept custody of a Minuteman III reentry system (RS)?
A locally created automated prodeuct
Air Force (AF) Form 525, Records Disposition Recommendation
Air Force Technical Order (AFTO) Form 359, Maintenance Data Collection Record
AF Form 504, Weapons Custody Transfer Document
For reentry system (RS) custody transfer, who prepares an original and one copy of the Air Force (AF) Form 504, Weapons Custody Transfer Document, leaving the individual signature blocks blank?
Munitions accountable systems officer (MASO)
Deputy launch commander
Breakout crew chief
Launch commander
After delivering the weapons to the alert aircraft, what does the driver mark on the work order?
The trailer serial number
The aircraft tail number
The words "Mission Completed"
The words "Complied With"
What must be done to nuclear weapons before they can be loaded to another aircraft after they are downloaded?
Recertified
Revitalized
Inventoried
Accounted for
The maintenance team chief who is responsible for final assembly must prepare and sign the buildup sheet. Who must physically verify the serial numbers and configuration and certify them by signing the buildup sheet?
Any noncommissioned officer (NC)
Bay chief or above
Knowledgeable NCO
Munitions operations
Who submits monthly nuclear ordnance shipping schedule (NOSS) forecasts to the Nuclear Control Point (NCP)?
Defense Threat Reduction Agency (DTRA)
Department of Energy (DOE)
Join Chief of Staffs (JCS)
Major commands (MAJCOM)
Which document do we use to update accountable transactions in Defense Integration and Management of Nuclear Data Systems (DIAMONDS)?
Maintenance activity report (MAR)
Weapons information report (WIR)
Electronic inspection record card (eIRC)
Weapon status report (WSR)
Whose signature certifies the expenditure statement, for test items expended during stockpile flight testing or other operational test and evaluation testing, on expenditure documents?
Wing commander
Squadron commander
Munitions Control
Munitions accountable systems officer
How do you transport the W80 warhead on a MHU-141/M munitions handling trailer?
Lock one diagonally opposite caster 90 degrees (*) outboard to the bomb's longitudinal axis
Lock two diagonally opposite caster 90* outboard to the bomb's longitudinal axis
Lock two diagonally opposite caster 90* inboard to the bomb's longitudinal axis
Lock one diagonally opposite caster 90* inboard to the bomb's longitudinal axis
Who is responsible for accepting custody of nuclear cargo that has been positioned for loading?
Shipping courier
Receiving courier
Aircraft loadmaster
Security forces entry controller
What size suspension system carries the B61 weapon system?
20-inch
25-inch
30-inch
35-inch
Which two assemblies make up the B83 weapon sytem?
Forward case and afterbody
Midcase and aft case
Nose and afterbody
Forward and aft
Which section of the B83 weapon system provides shock mitigation during delivery?
Nose
Midcase
Afterbody
Forward case
Which handling gear (H-gear) is used to store, transport, and hold the B83 gravity weapon system during maintenance?
H1229
H1609
H1125A
H1347A
When inspecting the external surfaces of a bomb, which type of markings is compromised of chock bands, center of gravity, and match marks?
Important
Sensitive
Critical
Urgent
When inspecting a bomb for damage, which condition is not considered an acceptable manufacturing defect?
Tooling marks
Loss of Sealant
Minor surface irregularities
Discoloration due to welding
Which of the following is not part of preparing a bomb for strike?
Performing a visual monitor
Changing the fin orientation
Installing a wire rope and pin assembly
Performing a detailed surface inspection
When can you perform command disablement system (CDS) on war reserve (WR) weapons?
Before shipment of bomb
After the mandatory wait period
When directed by proper authority
During receipt inspection of bomb
Which tool may be used as part of the non-violent disablement procedure for a nuclear weapon?
Measuring tape
Wrench
Hammer
Pliers
When, if ever, would you unpack weapon components and cables from the H1127 storage bag for inspection procedures?
If the item show signs of damage
If the median cover is damaged
Sometimes
Never
When inspecting bomb handling equipment, what is the correct procedure upon finding a cracked threaded shank eyebolt on a H1125A bomb hand truck (BHT)?
Submit a quality deficiency report (QDR) and tag with Department of Defense Form (DD Form) 1577-2, Unserviceable (Reparable) Tag - Material
Submit an unsatisfactory report (UR) and tag with DD Form 1577-2
Replace cracked eyebolt and submit a UR
Replace cracked eyebolt
When inspecting bomb handling equipment, which criteria would make the H1125A/H1671 handling equipment unserviceable?
Surface blemish greater than 2 inches
Cracks and splits over 1 inch in length
Swivel eyebolts have longitudinal movement
Swivel eyebolts are too tight to allow smooth rotation
What is an inspection point of the H1242 swivel caster assembly?
Spring pin or rod protruding from either side of cam lock cap
Cracks in threaded shank eyebolts
Mixed caster assemblies
Wheels turn freely
What must you check immediately after lifting a bomb using a H1004 bomb-hoisting adapter and hoist?
Circuit breaker test
Keeper verified engaged
Quick-release pin locked
Proper balance
How are the swing bolts of the H1125A/H1671 top cradle torqued?
25 ±5 foot-pounds (ft-lb)
50 ±5 ft-lbs
No torque; tighten securely
No torque; finger tighten only
After lowering the B61 on the H1229 maintenance stand, what must you do before closing the cradle bands?
Ensure the cutout portion of large clamp butts against the forward lug
Release the wight of the bomb and remove the lifting equipment
Adjust the leveling feet on the stand to prevent wobble
Equalize your body potential with the bomb
When you use the H1354 machine-screw removal tool to remove the last screw from a B61 subassembly during disassembly, you should install
The top screw, torque
The top screw, hand tighten
A screw next to the screw you are removing, torqued
A screw next to the screw you are removing, hand tighten
Which items would you use to remove a stuck bomb radar nose of a B61?
Shim stocks
Hammers and mallets
Two special pry bars
Nose removal devices
The case-separation limiter on the B61 only works if the
Center of gravity is correct
Tail is turned less than 45 degrees
Cable is kept tight when disconnecting
Tail is kept in direct line with the preflight
When connecting the gas generator on the B61, you equalize your body potential by touching
Anywhere on the preflight
Anywhere on the subassembly
And maintaining contact with the gas generator
And maintaining contact with the suspension lug
After mating the B61 subassemblies, install the top three high-torque screws and torque them to
120 ±10 inch-pounds
130 ±10 inch-pounds
140 ±10 inch-pounds
150 ±10 inch-pounds
Which type(s) of equipment is/are authorized to lift a double-stack of B83s?
Forklifts only
Forklift and H1004
Hoist only
Hoist and H1004
Which type of maintenance does the Secure Transportable Maintenance System (STMS) provide?
Base intrusion security system (BISS)
Vault troubleshooting and testing
Weapons maintenance
Weapons movements
The W80 warhead is equipped with a
Code activated processor (CAP) and command disablement system (CDS)
Permissive action link (PAL) and violent disablement system (VDS)
Multiple code coded switch (MCCS) PAL system
PAL and VDS
What piece of equipment is primarily used to install and remove the W80 warhead payload to and from the H1388 shipping and storage container?
H1387A strongback
H1337A hoist swivel adapter
H1004 warhead hoisting adapter
H563 below-the-hook lifting device
The MHU-89/E work stand includes all the following except
Supporting up to two warheads
Mounting on the MHU-141/M munitions handling trailer
Supporting the payload during storage
Preventing the payload from rolling off
What is an acceptable location to perform a full external surface inspection on a W80 warhead?
Suspended on H1004 hoisting adapter
Inside the H1388 shipping and storage container
Mated into an air-launched cruise missile (ALCM)
Suspended on the H1387A strongback or other handling equipment
Which component is not a part of the H1388 shipping and storage container?
Foam support
Inner container
Caster assemblies
Pad and support assembly
To remove the warhead with the H1387A strongback, attach the lifting device to
The aft clevis
The lifting arm end link
The middle lifting point
Any convenient location
What other equipment do you use with the T557 digital thermometer to determine the condition of the reservoir during a W80 warhead limited life component exchange (LLCE)?
CT1600 cable
DE1001 cable
H1601 nut connector
MHU-1405 template adapter
How are air-launched cruise missile (ALCM) and MHU-159/E guided missile handling unit secured to the MHU-141/M munitions handling trailer for payload mate and demate?
Bolts
Casters
Slotted grooves
Swivel and link assemblies
What air-launched cruise missile (ALCM) configuration gives the missile a maximum width of 24 inches?
Navigational
Captive
Terrain
Flight
The two methods used on the air-launched cruise missile (ALCM) to extend the inlet body during launch are a mechanical backup and
Explosive actuators
Engine exhaust
Gravity
Inertia
Which air-launched cruise missile (ALCM) payload bay door feature allows you to see if a payload is installed?
View ports
Warhead access panel
Payload indicator device
Safe, arm, and fuzing (SAF) window
What interfaces between the MHU-186/E guided missile hoisting beam and a missile with an ejector installed?
Retaining clips
Lifting lugs
Adapters
Shackles
The CVU-143/E umbilical receptacle protective cover protects the umbilical receptacle from
Physical damage during flight
Electromagnetic pulse (EMP) during flight
Physical damage during maintenance
Pneumatic connection during maintenance
What is the function of the MXU-691/E control surfaces missile ground safety lock?
Retracts the engine inlet latch mechanism before loading
Provides a point to attach the static ground cable
Prevents the desiccant container from ejecting
Inhibits the missile wings from deploying
When do you perform missile safe status checks?
Before the first operation
After the first operation
Before the last operation
After the last operation
Nuclear hardness of the pylon is maintained when personnel
Follow exactly the procedures in the maintenance manuals that are clearly identified as hardness critical procedures (HCP)
Complete the HCP in any order as long as they complete all of them
Complete all required continuity checks
Complete all required safety checks
What provides easy access to the aft pylon support fitting?
Missile fairing access doors
Avionics equipment access doors
Trailing edge fairing access doors
Upper and lower ejector access doors
Electrical and pneumatic missile connections on the pylon are made through the
Relay assembly
Umbilical connectors
Breakaway connector
Missile interface unit (MIU)
How many swing arms support the entire weight of the pylon and are retractable for pylon removal?
2
3
4
5
What is attached to the pylon and acts like a "ball socket" that receives the "ball joint" from the pylon loader adapter (PLA) swing arm?
Ball pads
Shear joint kit
Pylon adapter hooks
Pylon support fitting pad kit
Which part of the aircraft guided missile and bomb rotary launcher (AGMBRL)/common strategic rotary launcher (CSRL) provides mechanical and structural support for the aircraft and suspended loading and checkout frame (SLCF)?
Cable reel
Relay assembly
Forward drive fitting
Aft end fitting assembly
How many arming solenoids are incorporated into the ejector?
4
3
2
1
The reentry vehicle (RV) is designed to perform all of the following functions except
Deploy penetration aids
Generate arming and fuzing (A&F) signals
Survive the reentry in the Earth's atmosphere
Prevent premature detonation of the warhead (WH)
What design of the reentry vehicle (RV) overcomes the intense heat generated by reentry?
Spin system
Ablative material covering
Missile guidance system
High-impulse transducer
A material for the reentry vehicle (RV) heat shield is made of is
Titanium
Aluminum
Polyethylene
Carbon
The reentry vehicle (RV) overheating at reentry is prevented by the "sloughing" off. What does "sloughing" mean?
Layering of material
Hardening by heat
Casting aside
Building up
Which section of the MK21A reentry vehicle (RV) houses the high impulse transducer (HIT)?
Forward
Body
Rear
Mid
Which reentry vehicle's (RV) section houses the W78 warhead (WH)?
MK21 aft section
MK21A mid section
MK21 body section
MK12A forward section
Which component is part of the MK12A reentry vehicle's (RV) aft section?
WF1 cable
High-impulse transducer (HIT)
In-flight disconnect (IFD) plug
Arming and fuzing (A&F) assembly
You use the MHU-170/E guided missile warhead section lift truck when installing or removing payload to and from an
Air-launched cruise missile (ALCM) on a pylon
Advanced cruise missile (ACM) on a launcher
ALCM/ACM on a pylon/launcher
ALCM on a MHU-141/M munitions handling trailer
The MK21 reentry vehicle (RV) is divided into how many major parts or sections?
2
3
5
6
Which inspection, if any, is performed after a verification inspection on a reentry vehicle (RV) is completed?
Receipt
Final receipt
Interim verification
No further operation is required
What size safety wire is used to secure the electronic inspection record card (eIRC) packaged in a waterproof envelope to the reentry vehicle's (RV) shipping and storage container (i.e., H1224A or H1473)?
0.020 inch
0.030 inch
0.032 inch
0.044 inch
After you inspect the high impulse transducer (HIT) cable in the MK21A reentry vehicle (RV) forward section, you find a broken safety wire. What should you do next?
Reject forward section
Replace safety wire
Submit dull sword report
Accept as is
What should your next step be when you find a broken safety wire in the MK21A reentry vehicle's (RV) mid section during inspection?
Reject the mid section
Replace the safety wire
Submit a dull sword report
Accept as is
How many times during a recycle can you lightly sand a contaminated area of the reentry vehicle (RV) carbon-phenolic material?
Once
Twice
As many times as required to clean the contaminated area
No more than three as long as you can clean with isopropyl alcohol between sanding
If a replacement breech joint setscrew fails to move with 5-inch pounds (in-lb) of applied torque, what action do you take?
Remove some of the nylon-locking feature
Replace the entire component
Remove locking screw insert
Replace setscrew
When you perform hardness critical procedures (HCP), identifies as **HCP** in the technical order (TO), you must
Make substitution of any hardware
Perform steps exactly as given
Perform electrical steps in any sequence
Complete steps in any sequence as long as you do them all
What is the only authorized shipping and storage container for shipping the W78 warhead (WH)?
H1639
H1473
H1224A
H1388B
When installing the W78 warhead (mid section) in the reentry vehicle (RV) maintenance stand, you know it is positioned correctly when the
Bar alignment mark on the aft section aligns with the arrow alignment mark on the front of the cradle
Bar alignment mark on the mid section aligns with the arrow alignment mark on the aft end of the cradle
Arrow alignment mark on the aft section aligns with the bar alignment mark on the front of the cradle
Arrow alignment mark on the mid section aligns with the bar alignment mark on the aft end of the cradle.
When installing the warhead (WH) in the MK21A reentry vehicle (RV) maintenance stand, you create a friction load between the mid section and the cradle by
Turning either tape fully clockwise
Installing six socket head screws and washers
Installing eight high-torque Allen wrench bolts
Turning both jackscrew hand knobs simultaneously
What part of the reentry vehicle (RV) hoisting adapter do you use for lifting and transferring the MK21A RV?
Spanner wrench
Upper support ring
Lower support ring
Forward support sling
After you assemble two MK12A reentry vehicle (RV) sections, the breech joint is acceptable if you cannot insert the feeler gauge more than 0.5 inches in how many consecutive locations?
4
5
9
10
Which component is not part of the reentry system (RS) installation kit?
Spline adapter
Support fitting
Zero-impulse bolt
Pressure cartridge
Which stand supports the MK12A reentry vehicle (RV) during installation and removal of the reentry system (RS) installation kit?
Forward section support
Ball-lock installation
RV maintenance
RS maintenance
The elaborate torque procedure for the zero impulse bolts (ZIB) serves several necessary purposes. Which option is not one of them?
To ensure the bolt is not defective
To ensure the collar is not defective
To ensure the bold is seated properly
To ensure the mating frustum is in the correct angle
During an electrical checkout, what should a technician do when cables are left disconnected from a test set because of a new cabling diagram?
Submit an Air Force Technical Order (AFTO) Form 22, Technical Manual (TM) Change Recommendation and Reply, to update technical order
Submit a quality deficiency report
Continue the test; it is permissible
Reject the component
What should you do if a malfunction occurs during a stray voltage test of the forward section?
Reassemble system without forward section and attach a Department of Defense Form (DD Form) 1577-2, Unserviceable (Reparable) Tag - Material
Remove and reinstall forward section, the retest until it passes
Reject and replace forward section
Submit a maintenance assistance request
During the checkout of cable W3A, how is the ARM/MATE nut tightened on the P3 of the W4145 cable?
Finger tighten only
Tighten securely only
Torqued to 72 ±10 inch-ounces
Torqued to 72 ±10 inch-pounds
What is the rejection criterion for the W87 body section when you inspect the internal forward edge for delamination and/or chips that affect the bond line?
Damaged area greater than 0.10 inch
Damaged area smaller than 0.09 inch
Feeler gauge inserted into more than two consecutive locations
Feeler gauge inserted into more than four consecutive locations
When inspecting the W87 body section, what is a reason to reject the heat shield plugholes?
Less than one full normal threads remain
Less than two full normal threads remain
Thread check function results in plugs seating properly
Threads were not cleaned within specific time limit after being contaminated
When inspecting the W87 body section, which option is a reason to reject the radio frequency subsystem (RFSS) cables located in the interior of the W87 aft section?
A defect measuring 0.020 inch in depth
A defect measuring 0.5 inches in length
The cable identification number is illegible
The length of defect extends 45 degrees around cable circumference.
What is the only authorized shipping and storage container for shipping the W87 warhead (WH)?
H1473
H1673
H1224A
H1388B
What do you use to cover the fuse support shield once you remove the warhead electrical system (WES) cap?
Cork sheet
Wool felt sheet
Disposable cloth
Polyethylene plastic sheet
What equipment attaches to the facility hoist and the MK21 reentry vehicle (RV) forward section for handling operations?
H1473A support
MHU-210/E stand
TLU-433/A adapter
RV mating and handling sling
What do you install to hold the reentry vehicle (RV) maintenance stand cradle in the open position before you place a RV in the stand?
Two long shank knobs
Quick-release pin
Threaded fastener
Mounting bolt
During reentry vehicle (RV) disassembly, where must you install the MK21 RV before you remove cable W4A?
RV pallet
RV maintenance stand
Arming a fuzing stand
Ball-lock installation stand
Once the ball-lock restraining tool is removed during reentry vehicle (RV) disassembly, what is inserted into the cartridge port?
In-flight disconnect connecter installation tool
Separation nut wrench
Ball-lock retraction tool
Protective cap
When disassembling the reentry vehicle (RV), before you lift the forward section from the body section, you must rotate it until
It clears the body section
You hear a click
The index mark on it aligns with the S mark on body section
The index mark on it aligns with the arrow on body section
When assembling the MK21 reentry vehicle (RV), what must you turn 90 degrees on the arming and fuzing assembly (AFA) mating base fixture before you install the fixture on the body section?
Cleats
Teeth
Tines
Tapes
How do you verify alignment when torquing the forward section on the MK21 reentry vehicle (RV) during assembly?
Make sure the "S" mark on the forward and body sections align
Make sure the zero degree (0*) marks on the forward and aft sections align
Use the alignment fixture to make sure the sections are properly seated
Use a feeler gauge to measure the hap around the breech joint threads
During MK21 reentry vehicle (RV) assembly, what secures the rear cover of the RV to the body section?
Four quick-release pins
Four mounting bolts
30 torque setscrews
16 torque setscrews
You locate the W4A cable to install on the MK21 reentry vehicle (RV) during assembly by identifying the
Part number on the blue band
Red band visible on the lock pins
Red band located approximately 6 inches from the connectors P2550/2552
Two blue bands located approximately 6 inches from connectors P2550/2552
The humidity indicator plug on the H1473 shipping and storage container indicates excessive moisture inside the container by turning
Bright yellow
Slight pink
Orange
Red
If units do not receive nuclear ordnance controlled material items by the estimated delivery date for backordered items, the nuclear accountability and reporting section (NARS) follows up with Nuclear Security Campus (NSC) personnel at leat
Daily
Weekly
Every 30 days
Every 45 days
Who processes the Air Force (AF) Form 2005, Issue/Turn-in Request?
Flight chief or flight commander
Plans and scheduling coordinators
Maintenance officer or superintendent
Nuclear accountability and reporting section (NARS) monitors
After receiving incoming classified property, when do you physically inspect it?
Within 1 day
Within 1 hour
As soon as practical
By the end of the week
For outside the continental United States (OCONUS) shipments, start follow-up action if you do not receive a signed Department of Defense (DD) Form 1348-1A, Issue Release/Receipt Document, within how many days?
15
30
45
90
Who is responsible for preparing the Department of Defense (DD) Form 1911, Material Courier Receipt?
Munitions accountable systems officer
Weapon custodian
Receiver
Shipper
Who signs the Air Force (AF) Form 2005, Issue/Turn-in Request, upon issue or turn in of property?
Repairable item custodian
Maintenance superintendent
Noncommissioned officer in charge (NCOIC) weapons support g.
NCOIC plans and scheduling
Do not issue Group-X kits
In bulk
One for one
On a consumption basis
On an amount required for weekly maintenance schedule
What form do you use to turn in items that are found-on-base (FOB)?
Department of Defense (DD) Form 1149, Requisiton and Invoice/Shipping Document.
DD Form 1150, Request for Issue or Turn-in
Air Force Technical Order (AFTO) Form 244, Industrial/Support Equipment Record
Air Force (AF) Form 2009, Manual Supply Accounting Record
When cleaning excess lubricant from mounting holes on the B61 after assembly, you should use
Aircraft cleaning compound and hot water
Toluene and hot water
Denatured alcohol
Isopropyl alcohol
Which technical order (TO) do you use to handle, protect, and inspect electrical connectors when procedures are not contained in the weapon-specific TO?
11N-45-51A
11N-45-51
11N-35-51A
11N-35-51
What must you do if you are rotating a H1229A maintenance stand and the bomb radar nose is still attached to the bomb?
Remove the nose
Attach the nose sling
Readjust the bomb's center of gravity
Remove the maintenance stand deck plate
Which piece of equipment do you use to monitor tritium gas during limited-life component (LLC) exchanges?
T468
T566
AN/PDR-74A
AN/PDR-460
To remove the H1097A storage bag from the B83, you disengage the
Aft strap, then disengage the center strap, then remove
Center strap, then disengage the aft strap, then remove
Forward strap, the center strap, and finally the rear straps, then remove
Rear strap, the center strap, and finally the forward straps, then remove
What is the next action you take upon finding separation of rubber from the wheel hub of the H1347/H1347A bomb handling equipment?
Take depth measurements at various locations to ensure it does not exceed acceptable levels
Conduct a 1,000 feet roll test and verify the wheel hub rolls freely without hindrance
Remove weight from casters and attempt to move tire laterally
Reject the weapon and submit an unsatisfactory report (UR)
When inspecting the H1347/H1347A bomb handling truck, which situation is acceptable?
Axle bolt is flush with the locking nut
Caster assemblies have different part numbers
Spring pin protrudes from both sides of cam lock cap
Caster cam lock does not have knurled cap but is operational
Which test equipment do we use to determine if the limited life component (LLC) has been fired for the B83?
T566
T304C
T461/T475
AN/PDR-74A
A pair of tapes on a B83 bomb consists of two tapes marked with
Matching serial numbers, with an A or B prefix
Matching serial numbers, with an A or B suffix
Different serial numbers, with an A or B prefix
Different serial numbers, with an A or B suffix
When removing the aft assembly, which pair of B83 tapes do you remove first?
Whichever pair is loose
Whichever pair is tight
Lower pair
Upper pair
What is the maximum pounds per square inch gauge (psig) of air pressure used for removing B83 tapes?
85
75
65
55
After you remove the tapes from the B83, how do you store them for reuse?
In the straighten position, in different, serial numbered pairs
In the straightened position, in matched, serial numbered pairs
In the curved position, in different, serial numbered pairs.
In the curved position, in matched, serial numbered pairs
During a B83 reassembly, when do you perform the T304C continuity test(s)?
Before starting the reassembly procedures
Before and after connecting the cable assembly
After connecting the cable assembly and after installing tapes
After connecting the cable assembly and before installing tapes
Which B83 tapes do you install first?
Lower pair
Upper pair
Tape etched "Install this first"
There is no order during reassembly
When installing B83 tapes, if the tip of the H1452 tape driver comes up against the end of the case slot before the tape is fully seated what should you do?
Turn the H1452 90* in the hammer and use the flat side
Turn the H1452 180* in the hammer and use the flat side
Replace the bad tape
Reject the weapon
What connects in line with the components cooling unit (CCU) and is used to check the operations of the bypass valves?
Nitrogen charging adapter set
Differential pressure gauge
Barometric pressure gauge
Nitrogen servicing cart
Before mating missiles, the pylon requires a periodic inspection every
12 months
24 months
36 months
48 months
The bearing that allows the launcher to rotate is part of the
Cable reel
Relay assembly
Forward drive fitting
Aft end fitting assembly
What is the purpose of the nitrogen-charging adapter set?
Checks the bypass valves for proper operation
Monitors the rotation of the rotary launcher
Fault isolates the launcher and pylon circuits
Performs pressurization and leak test of the launcher and pylon
Which areas are not inspected when inspecting a launcher loader adapter (LLA)?
Adapter hooks
Fasteners
Markings
Cables
When preparing a launcher for shipment, you are not required to
Secure all loose cables
Perform an electrical checkout
Place the launcher on dunnage platforms
Remove the decoder-receiver, nuclear station logic unit (NucSLU), and relay assembly
What position is the shut-off valve of the nuclear station logistic unit (NucSLU) in for missiles?
Closed
Opened
Retracted
Recessed
Which assembly is not a major component of the ejector rack?
Shackle
Gas tube
Side plate
Spline drive
What regulates the ejection force of each ejector piston of the aircraft/bomb ejector rack assemblies?
Tube assembly
Actuating rods
Impulse cartridge
Changeable orifice
On the reentry system (RS), what supports the reentry vehicles (RV)?
Shroud
Penetration aids
Ablative material
Deployment module
During the initial launch, what protects the warheads (WH) until the reentry system (RS) reaches the outermost stmosphere?
Shroud
Spin rockets
Penetration aids
Deployment module
Where is the rocket motor located in the reentry system (RS)?
Reentry vehicle (RV)
Deployment module
Forward shroud
Aft shroud
What is the purpose of the V-band clamp?
Provides in-flight disconnect capabilities to the arming a fuzing (A&F) cables
Holds the aft shroud and the payload support frustrum together
Initiates the rocket motor that jettisons the shroud assembly
Allows the chaff to disperse at a predetermined time
If a thermal panel on the inside of the aft shroud is still loose after torquing, you must
Reject it
Accept it
Replace the hardware
Replace the thermal panel
If while inspecting the W6A cable on the reentry system (RS) you find damage to the sleeving which also involves damage to the wire insulation underneath, what do you do?
Repair the sleeving
Reject the W6A cable
Repair the wire insulation and sleeving
Accept the cable as long as it passes test checkout
On the reentry system (RS), how is one 180-degree section of the shroud release shield removed during aft shroud removal
Removing three thumbscrews from slots in the extension
Removing two thumbscrews from each end of the shield
Disconnecting three quick-release pins from slots in the extension
Disconnecting two quick-release pins from each end of the shield
The V-band clamp on the reentry system (RS) is preloaded with how many pounds?
600
1,600
4,600
6,000
When removing the chaff dispenser, approximately how many inches do you pull the dispenser retainer so the rear uniball fitting disengages the bulkhead rear fitting pins?
Two
Three
Four
Five
Before handling, connecting, or disconnecting RS electrical equipment, you must immediately
Don a grounding wrist strap and connect it to its metal part of component
Don a grounding wrist strap and connect the other end to the facility ground
Rid yourself of static electricity by touching a metal structure of the component
Rid yourself of static electricity by touching a metal portion of the explosive set circuitry test set (ESCTS)
The parameters the reentry system test set (RSTS) measures are
Resistance, voltage, time, frequency, and pressure
Resistance, voltage, time, frequency, and capacitance
Resistance, voltage, insolation, frequency, and pressure
Resistance, voltage, isolation, frequency, and capacitance
When testing the arm and disarm (A&D) device using the reentry system test set (RSTS), what indication do you look for when the safing pin is installed?
"S" is in the window of the A&D device
"A" is in the window of the A&D device
A "NO GO" indication on the test
A "GO" indication on the explosive set circuitry test set (ESCTS)
When performing a fault isolation procedure using the explosive set circuitry test set (ECSTS), what steps do you perform if the test results indicate greater than 5.0 ohms (Ω)?
Document all actions, test indications, and seek higher guidance
Clean the cable connector, check for proper connection, and then repeat the test
Disconnect the cable W4250 from the test set and from plug P2550; return to the flow diagram
Disconnect the cable W4250 from the test set and from plug P2550, remove the protective cap from jack J2550, connect plug P2550 to jack J2550, and return to the flow diagram
When performing a fault isolation procedure using the explosive set circuitry test set (ECSTS), what steps do you perform if the test results indicate less than 5.0 ohms (Ω)?
Document all actions, test indications, and seek higher guidance
Clean the cable connector, check for proper connection, and then repeat the test
Disconnect the cable W4250 from the test set and from plug P2550; return to the flow diagram
Disconnect the cable W4250 from the test set and from plug P2550, remove the protective cap from jack J2550, connect plug P2550 to jack J2550, and return to the flow diagram
When installing the V-band, how do technicians apply torque to the self-aligning nuts on each V-band thruster bolt?
Simultaneously in one-turn increments
Simultaneously in two-turn increments
Alternately in one-turn increments
In any order
To transfer the reentry system (RS) to the munitions facility pit, use an overhead hoist and the
RS handling fixture
RS alignment fixture
Reentry vehicle (RV) hoisting adapter
RV mating and handling sling
Before transferring a forward shroud on a pallet, how do you secure the upper support ring to the forward shroud pallet?
Two quick-release pins
Four safing pins
Five hex bolts
Six securing clamps
When transferring the payload support, how do you fasten it to the aft element support plate?
Two quick-release pins
Four safing pins
Five hex bolts
Six securing clamps
Which component provides electrical and mechanical interface between the reentry vehicle (RV) and the deployment module (DM)
Reentry system (RS) installation kit
Power distribution module (PDM)
Environmental sensing signal generator (ESSG)
Electronic command signals (ECS) programmer
When are you required to test and monitor for toxic air within the Weapon Storage and Security System? (WS3)?
Never
Weekly
Before the vault is closed
Before personnel are allowed to enter the vault
Which option is not a component of the Secure Transportable Maintenance System (STMS)?
Environmental control system
Alternate controller
Fume extractor
Crane
How are the ejector rack pylon interface (PI) fittings used?
Physically bolting the ejector rack to the pylon
Mechanically linking avionic components
Electrically charging the ejector rack
Physically mating cables to the pylon
What orifice designation is used with the air-launched cruise missile (ALCM) ejector?
11
10
6
5
If the cartridge retainers on the ejector assembly are safety wired, this tells you
Explosive cartridges are installed; ejector is in extended storage configuration
Explosive cartridges are installed; ejector is in ready storage configuration
Someone incorrectly installed the explosive cartridges
Explosive cartridges are not installed
Which ejector rack is the only device we use to attach an air-launched cruise missile (ALCM) to a pylon?
MAU-12D/A
MAU-44
BRU-12
BRU-44/A
Which procedure is not part of final ejector rack installation
Ensure ground safety pin moves freely
Verify shackle linkage is latched
Screw down ejector piston feet
Proof load test the ejector rack
Which cartridges do you use in the air-launched cruise missile (ALCM) ejector?
ARD 446-1 in the aft and forward breach
ARD 863-1 in the aft and forward breech
ARD 863-1 in the aft breech; ARD 446-1 in the forward breech
ARD 446-1 in the aft breech; ARD863-1 in the forward breech
The easiest pylon positions to mate are centerline, located at position
1 or 3
2 or 5
3 or 6
4 or 6
When inspecting the umbilical radio frequency interface (RFI) rings, replace the umbilical if
More than two tines are bent and missing in any quarter
More than one tine is bent and missing in any quarter
A total of 12 or more tines are bent or missing
Any tines are bent or missing
When mating an air-launched cruise missile (ALCM) to a pylon shoulder position, what must you install on the handling unit?
One roll block in the center
Two roll blocks on the aft beam
Four roll blocks; 2 forward, 2 aft
Three roll blocks on the forward beam
To secure the launcher in the suspended loading and checkout frame (SLCF), rotate the forward and aft downlock drives until the indicators show
SCREW IS UP
SCREW IS DOWN
SPLINE ENGAGED
SPLINE DISENENGAGED
Who is responsible for preparing command disable system (CDS) codes when shipping CDS equipped weapons and what is the classification of these codes?
Receiver; Secret
Shipper; Unclassified
Shipper; Classified
Receiver; For Official Use Only
The electrical operating system that fully opens the Weapon Storage and Security System (WS3) vault in approximately 3 minutes describes which operating system?
Alternative
Primary
Back-up
Reserve
You should use the Weapon Storage and Security System (WS3) alternate operating system when
It is necessary to quickly access the vault
Performing a functional check of the system
The primary system is nonoperative or requires repair
Testing limit switches for the safety zone and mid-level positions
Which Weapon Storage and Security System (WS3) vault control control group component contains two recode module receptacles for entering unlock codes during recode operations?
Vault electrical support panel
Shelter control panel
Vault processor
Vault assembly
Who controls the keys to the locks used for lockout operations?
Anyone
Team chief
Key custodian
Munitions control
How are tags attached to energized equipment or energy sources if that equipment is not to be used?
Securely
Anywhere
Center of the source
Securely and easily seen
Which space is not a confined space?
Storage igloo
Space with limited entry or exit
Weapon Storage and Security System (WS3)
Space not designed for continuous occupancy
Which Weapon Storage and Security System (WS3) component provides periodic polling of the vaults to check their operation and the status of the communications link?
Vault processor
Message processor
Authentication unit
Data communicator
In the event of a power failure, the uninterruptible power system (UPS) supplies equipment and console power for at least how many hours?
10
8
6
4
The authority to modify identification numbers and time delay (ID-TD) data for opening of the Weapon Storage and Security System (WS3) is given by the
Flight chief
Major command (MAJCOM)
Squadron commander
Immediate supervisor
Which Weapon Storage and Security System (WS3) vault control group component operates the vault's primary operating system?
Shelter control panel
Alternate controller
Vault assembly
Vault processor
Which Weapon Storage and Security System (WS3) vault assembly component contains sensors that detect water accumulation and earth movement?
Barrier and cover plate
Platform assembly
Liner assembly
Barrier support
How do you secure the missile-handling unit to the lift truck table manipulator head during missile transfer?
Two bolts and four washers
Three captive bolts
Two-quick release pins
Four-quick release pins
To what position do you set the suspended loading and checkout frame (SLCF) directional control valve for launcher rotation with a power drive unit controller (PDUC)?
Primary
Secondary
Forward
Backward
On the munitions handling trailer (MHT), how many attaching fittings per lift beam are used at any one time?
1
2
3
4
You use manual pumps on the munitions handling trailer (MHT)
During lift operations for critical adjustments
Simultaneously with the portable control unit
To deploy the jack assemblies and level the load
For emergency lift operations during power failure
How does the service brake system on the MHU-141/M munitions handling trailer operate?
Standard automotive brakes
Action of the automatic surge brake
Air hoses between the trailer and tow vehicle
Electrical cable between the trailer and tow vehicle
When transporting B83s on a 40-foot trailer, when (if ever) is blocking used?
When you have more than one bomb on the trailer
For a single stack B83 when not exceeding 25 miles per hour (mph)
For a double stack of B83s
Always
Which lift truck component holds the load level during lifting operations?
Manipulator head assembly
Lift arm mechanism
Hydraulic system
Drive train
How many pounds is the lift capacity of the MHU-83B/E gasoline-powered, self-propelled hydraulic lift truck?
5,000
7,000
8,000
10,000
The maximum jammer speed of the MHU-174/E electric-powered, self propelled hydraulic lift truck when loaded is
9 miles per hour (mph)
7 mph
5 mph
3 mph
How many minutes should you allow the lift truck engine to warm up to reach the optimum running temperature?
1
2
3
5
Before starting a gasoline or diesel lift truck engine during extremely cold weather, you may need to
Preheat the engine and hydraulic system
Start the lift truck and move it inside
Run the lift truck for 20 minutes
Cover the lift truck
On diesel lift trucks, remove air in the fuel lines by using which pump?
Piston
Steering
Fuel primer
Fuel oscillation
During the loading process, the pylon is secured to the suspended loading and checkout frame (SLCF) with
Four locking levers built into the frame
Three locking levers built into the frame
Two quick-release pins; one aft and one forward
Three quick-release pins; two forward and one aft
On the pylon loader adapter (PLA), how are the swing arms positioned when performing pylon post-load procedures?
Fully retracted and rotated 90 degrees (*) to clear
Fully retracted and rotated 90* to engage
Fully extended and rotated 90* to clear
Fully extended and rotated 90* to engage
How do you retract the hook on the launcher loader adapter (LLA)?
Remove the bolts securing the hooks and pull on the actuating rods
Remove the quick-release pins and manually lift the hooks into place
Rotate the actuating handle counterclockwise until the hooks are stowed
Remove pins and use a socket and speeder to rotate the hook drive bolt
During preloading, before positioning the pylon under the suspended loading and checkout frame (SLCF), make sure the
Swing arms are retracted; rotate them 90 degrees away from the missiles
Launcher forward and aft yokes are stowed
Frame aft pylon attach fitting is lowered
Leaning boards are retracted
The forward pendulum and fixed attachment fittings are installed in which position on the MHU-196/M munitions handling trailer for launcher loader adapter (LLA) mate?
A
B
F
H
What piece of equipment allows you to position a missile at an angle for a pylon shoulder position mate?
H1410A restraint tool
MHU-512/E munitions positioner
ADU-468/E positioning and restraint adapter
ADU-708/A restrictor plate adapter assembly
When connecting the umbilical connector to the missile, how do you know the engaging nut is fully seated?
The red ring is partially covered by the connector housing shell
The yellow ring on the nut is flush with the top of the housing
The white ring on the nut is flush with the top of the housing
The blue ring is below the connector housing shell
What do you do if the locking collar does not drop after you torque the attach bolt to 800 inch-pounds (in-lb. ) during a missile mate to a pylon?
Nothing, it is acceptable as it
Increase torque to 900 inch-pounds
Increase the torque in intervals of 150 inch-pounds
Back off the bolt and start torquing process over again
Which item is not part of ejector preparation for a gravity weapon mate to launcher?
Lanyard attachment assembly
Bomb pullout extension cable
Safing mechanism
Number "10" orifice
During pylon interface (PI) fitting installation on the ejector for the launcher mate, if you can't install the cotter pin after 20 inch-pound (in-lb. ) torque,
Tighten the nut a maximum of one flat
Back the nut off a maximum of one flat
Torque a second time to 40 in-lb
Replace the nut; torque to 30 in-lb
How do you tighten the sway brace pads for the B61?
Seven 1/8-turn increments
Six 1/4-turn increments
Three 1/4-turn increments
Three 1/8-turn increments
To measure and detect toxic air levels within the Weapon Storage and Security System (WS3), you would use which piece of equipment?
T566
AN/PDR-74A
Toxicity monitor
Toxic air test set
During normal operations, the toxic air test set indicator draws continuous air samples through probe and hose assemblies into
Oxygen and combustible sensors
Specialized filler holes
Mounted gas cyclinders
Fuzes and diodes
What is the maximum capacity of the Secure Transportable Maintenance System (STMS) lifting systems?
1,000 lbs
1,200 lbs
2,000 lbs
2,500 lbs
When preparing to load the launcher into the suspended loading and checkout frame (SLCF), the launcher spline key must be in the index or
12 o'clock position
9 o'clock position
6 o'clock position
3 o'clock position
What position must the frame power drive controller (FPDC) indicate before you can remove the launcher from the suspended loading and checkout frame (SLCF)?
000.0 degree (*)
090.0*
180.0*
360.0*
When removing the launcher from the suspended loading and checkout frame (SLCF), raise the launcher loader adapter from the suspended loader adapter (LLA) until the LLA yokes are approximately
2 inches below and aligned with the launcher aerospace ground equipment (AGE) rings
2 inches above and offset with the launcher AGE rings
4 inches below and aligned with the launcher AGE rings
4 inches above and offset with the launcher AGE rings
Once a nuclear weapon reaches the last transfer point, who is responsible for its security?
Department of Defense (DOD) weapons courier
Department of Energy (DOE) weapons courier
Receiving installation
Major command (MAJCOM)
Which items require shoring when being tied down in a safeguards transporter (SGT)?
H1616 containers
Gravity bombs
Warhead containers
Group-X kit pallets
What is the minimum spacing (center-to-center) for tie-down lugs in the safeguards transporter (SGT)?
2 inches (in.)
3 in
4 in
5 in
During transportation on the MHU-141/M munitions handling trailer with rail sets installed, where must the payload(s) be located
On the solid portions of the rail sections
So the cradles overlap the rail joints
In the center section of the rail set
Over the tires for added support
The military first destination (MFD) is the first military base that
Builds nuclear material
Stores training material
Accounts for or stores nuclear or limited life component (LLC) material
Accounts for or stores LLC material only
A weapon container not intended for towing is rated as
Roadable
Maneuverable
Limiter roadability
Limited maneuverability
How is the receipt or shipment of classified nuclear material done and verified for an airborne logistic movement, and by whom is it done?
The applicable work order; the team chief
Special assignment airlift mission (SAAM) listing; the maintenance supervisor
SAAM listing; the munitions accountable systems officer (MASO) or the appointed alternate and couriers
Military identification (ID) cards and courier/receiver lists; the MASO or the appointed alternate and couriers
Units do not coordinate forecasted logistics movements with which agency?
Airfield management office
Inspector general's office
Logistics readiness squadron
Office of special investigations
Which agency is responsible for shipping limited life components (LLC) in H1616 containers?
Pantex Plant
Savannah River Site
Sandia National Laboratory
Los Alamos National Laboratory
Which unlock codes do each set of recode modules store?
Twenty vault-specific maintenance, 20 mass upload, and one universal release
Twenty vault-specific maintenance, 40 mass upload, and two universal release
Forty vault-specific maintenance, 20 mass upload, and one universal release
Forty vault-specific maintenance, 40 mass upload, and two universal release
Which code modules stores and transfers a complete set of encoding keys to authentication units, sensor processors, and data authenticators?
Rekey
Unlock
Recode
Code storage
You will use the reserve set of rekey modules if the
Back-up set fails
Primary set is in use
Primary recode module fails
Primary and back-up sets fail
What is the main purpose of lockout/tagout procedures on a Weapon Storage and Security System (WS3)?
Inform all operators
Slow down operations
Prevent equipment damage
Prevent injury to personnel
Where can you find lockout/tagout procedures on a Weapon Storage and Security System (WS3)
Air Force Instruction (AFI) 21-204
AFI 91-101
Technical Order (TO) 11N-35-51
Air Force Manual (AFMAN) 91-203
Which space is not a confined space?
Storage igloo
Space with limited entry or exit
Weapon Storage and Security System (WS3)
Space not designed for continuous occupancy
When is a cross-load operational readiness inspection performed on a launcher?
After mating a weapon
Before mating a weapon
Following download from aircraft before going into storage
Following download from aircraft before upload on another aircraft
You close hooks of the ejector rack when mating a bomb to the launcher by turning the
Hook manual release clockwise (CW)
Hook manual release counterclockwise (CCW)
In-flight safety lock CW
In-flight safety lock CCW
Approximately, how far do you lower the lift truck from the bomb after the ejector hooks are closed and you see the safing mechanism installed for a bomb mate to the rotary launching assembly (RLA)?
2 inches
4 inches
8 inches
2 feet
When installing cartridges in the ejector, do all of the following except
Install the ground safety pin the the ejector
Touch the facility ground to discharge static electricity
Hold the retainers so they point away from other people
Stand in front of the orifice opening during installation and torquing
When do we perform the post download operational readiness inspection on a launcher?
Before mating a weapon
Following download from an aircraft and before going into storage
Following download from an aircraft and before upload to another aircraft
After completing weapon mate and before downloading the launcher from the suspended loading and checkout frame (SLCF)
When using the gravity weapon loading adapter for a B61 mate operation, how do you position the gravity weapon loading adapter support blocks?
In the inner holes
In the outer holes
Either in the inner or outer holes
One in the inner hole and one in the outer hole
How many different methods can you use to install or remove the BRU-44/A ejector rack to or from the rotary launcher assembly (RLA)
One
Two
Four
Five
What ejector cartridges are used with the BRU-44/A ejector rack?
ARD-22
DRA-99
BBU-63/B
CCU-121
What do you use to rotate the launcher if you cannot rotate it with the power drive unit controller (PDUC)?
T566 rotator
T1563 tester
Automatic spline controller
Manual rotation tool (pneumatic drill)
Which post-use inspection procedure do you not do on the MHU-141/M munitions handling trailer during extremely cold weather?
Setting the parking brake
Chocking the trailer wheels
Disconnecting the drawbar
Disconnecting the electrical and breakaway cables
What is the maximum load capacity on the MHU-196/M and MHU-204/M munitions handling trailers (MHT)?
40,000 pounds (lb)
30,000 lb
20,000 lb
10,000 lb
During the munitions handling trailer (MHT) towing operations, a fixed mechanical stop limits the front wheel bogies assembly turning to how many degrees counterclockwise (CCW)?
35
40
45
50
To mechanically lock the 7Q1E-10 semitrailer to a tow vehicle, what do we use?
Quick-release pin
Pintle hook
Draw bar
King pin
What type of inspection must you perform on the 7Q1E-10 semitrailer before loading?
Annual
Pre-use
Periodic
Semi-annual
How many GCU-1/B nylon webbing and tie-down straps can be used to replace a MB-1 tie-down/chain assembly for a double-stacked weapons configuration?
None
One
Two
Three
How do you find the location for the chocks on the MHU-141/M munitions handling trailer?
Use the alpha characters above the holes in the two horizontal frames
Use the numbers above the holes in the two horizontal frames
Count over the number of holes moving from left to right
Position chocks with the weapon's center of gravity
How much power does it take to operate the MHU-141/M munition handling trailer's tail and stop lamps?
12 volts direct current (VDC)
12 volts alternating current (VAC)
24 VDC
24 VAC
When preparing a munitions handling trailer (MHT) for tow, make sure the wheels are in the straight position and the
Forward-wheel locking pin is engaged
Forward-wheel locking pin is disengaged
Rear-wheel locking pins are engaged
Rear-wheel locking pins are disengaged
During extremely cold weather, up to how many minutes can it take the hydraulic pressure to reach the required pressure on the munitions handling trailer (MHT)?
5
10
15
30
After starting a diesel lift truck, what is the maximum time to wait for the oil pressure gauge to show pressure before stopping the engine and checking for malfunctions?
15 seconds
20 seconds
25 seconds
30 seconds
What do you do when driving loads long distances with the MJ-1 lift truck?
Lower the lift arms until the load is supported on the transport beam
Raise the lift arms 24 inches off the ground
Drive less than 3 miles per hour
Drive with two spotters
If the electric lift truck motor will not start when you push the start button, you may need to
Allows the started to cool for 80 seconds and adjust the engine revolutions per minute (rpm)
Hold the preheater/start switch to PREHEAT for 30 to 60 seconds
Make sure the oil pressure gauge indicates pressure
Bleed pressure off the hydraulic system
When preparing the MHU-174/E lift truck for towing, make sure you
Set the parking brake
Connect the power cable
Disengage the rear-wheel drive hubs
Equally adjust the width and wheelbase
On gasoline/diesel lift trucks, the hydraulic fluid level should be
Above the full and add indicator lines
Just visible above the screen in the filler neck
Two to three inches below the top of the opening
No more than one inch below the full indicator line
What are the two safety devices on the MHU-186/E hoisting beam?
Sling link and keeper
Keeper and shackle guard
Keeper and safety stop link
Safety stop link and shackle guard
What do you do with the handling unit legs of the guided missile handling unit when hoisting the air-launched cruise missile (ALCM) onto the MHU-141/M trailer?
Rotate them 180 degrees
Remove thrm
Extend them
Retract them
When using the MHU-174/E lift truck to handle the missile, make sure the
Continuity test is performed
Proof load test was accomplished
Ground points are connected firmly
Power cord or mast does not contact the missile
When preparing to remove the missile from the MHU-141/M munitions handling trailer, do all of the following except
Set the trailer brakes and chock the wheels
Ground the trailer to a facility ground
Check missile inspection record card
Perform the missile safe status check
What secures the missile-handling unit to the MHU-141/M munitions handling trailer?
Twenty nuts and bolts
Spline fastener adapters
MHU-169/E cradle adapters
MHU-162/E link and swivel assemblies
What is required when moving a missile with a lift truck?
Use spotters at each end of the missile
Remain clear of the aft end of the missile
Keep the lift truck wheels as close together as possible
Disconnect the lift truck from the facility ground during the move
What must you do first before lowering the missile and handling unit to the floor with a forklift?
Shut the forklift off
Reinstall the missile cover
Connect a grounding cable
Remove the handling unit bolts
The rear pendulum and fixed attachment fittings are installed in which position on the MHU-196/M munitions handling trailer (MHT) for pylon loader adapter (PLA) mate?
H
F
B
X
How many shims must you install on each attachment fitting when wrapping the pylon loader adapter (PLA)?
Only one
Two or more
Three or more
No more than two
Where do you position the LIFT FORCE POUNDS switch on the munitions handling trailer (MHT) for wrap or launcher operations?
10 thousand (k)
20k
40k
50k
Who establishes access controls to communications security (COMSEC) to properly cleared personnel? Ly cleared personnel?
Unit commander
Installation commander
COMSEC account manager
COMSEC account submanager
What is the first step of the operations security (OPSEC) process?
Assess risk and threats
Analyze vulnerabilities
Apply countermeasures
Identify critical information
When must your annual communications security (COMSEC) training be complete?
By the end of you anniversary month
On the beginning of your anniversary month
On the exact date of last annual training completed
Anytime prior to the exact date of last annual training completed
A communications security (COMSEC) deviation is
An occurrence involving a failure to follow established COMSEC instructions, procedures, or standards
When you are allowed to substitute one COMSEC procedure for another
A process whereby you are allowed to depart from an operational COMSEC step, and are allowed to return to it at a later date
When you bring to the attention of an evaluator COMSEC steps that have previously been accomplished
Which Weapon Storage and Security System (WS3) group provides communications and processing capabilities to status up to 64 vaults?
Console
Vault control
Coder-transfer
Monitor-indicator
Which personnel performs as monitoring facility operators (MFO) at the local monitoring facility (LMF)?
Communications maintenance
Munitions control
Security forces
Maintenance
The width and wheelbase of the MHU-174/E, MHU-83B/E, and MJ-40/E lift trucks adjust to support different
Shapes and surfaces
Weights and shapes
Size loads and surfaces
Size loads and weights
When can you use forklifts to lift and transport weapons?
When authorized to do so by the applicable technical order (TO)
Anytime the forklift rated capacity fits operational requirements
For loads weighing 80 percent of the rated capacity of the forklift
When a lifting method is not specified in the TO
What happens when the forklift oil temperature rises above safe operating limits?
The starter switch cranks, but the engine will not contrinue running
The engine oil pressure gauge reads zero
The ammeter needle reads upscale
The warning light appears
On the 6k gasoline engine forklift, how do the lift controls operate?
Pneumatically
Mechanically
Hydraulically
Electrically
The three-position, spring-loaded levers on the 6k gasoline engine forklift
Turn the forklift off automatically when engaged
Turn the forklift on automatically when engaged
Return to the standby position when released
Return to the neutral position when released
What is the minimum amount of tread a forklift's tire can have and still be acceptable?
1/16 inch
3/16 inch
3/32 inch
4/32 inch
When starting a forklift, do not hold the starter switch down more than how many seconds?
30
40
45
50
On a forklift, what determines the travel speed of the forks?
Up or down movement of the throttle control lever
Hydraulic control lever deflection
Hoist control level deflection
The idle speed of the engine
During a pre-use inspection, if you find an MB-1 tie-down device/chain assembly that is cracked what do you do, if anything?
Nothing
Replace the device
Report it to major command (MAJCOM)
Repair it if the crack is smaller than 1/2 inch
When you install the chain link into the chain recess, what precaution must you observe when using the MB-1 tie-down device/chain assembly?
Be sure to place the free end of the chain in the bottom of the chain recess slot
Make sure the loaded end of the chain rests in the bottom of the chain recess slot
Do not use the first few chain links in the chain recess slot
Do not use the last few chain links in the chain recess slot
What is not an authorized method for securing loose MB-1 tie-down/chain assembly ends to prevent damage during shipment?
Wrap the loose ends around the tie-down device and tape to the device
Loop the excess chain around the chain assembly and secure with duct tape
Coil the excess chain around itself and secure with pressure sensitive adhesive tape
Wrap the loose ends around the container tie-down point and secure with a cable tie
You use the load binder on the MHU-141/M munitions handling trailers to secure
Bolstered weapons on 25- or 40-foot trailers
Unbolstered weapons on 25-40 foot trailers
Bolstered weapons on the MHU-141/M trailer
Unbolstered weapons on the MHU-141/M trailer
How do you extend the trap on the CGU-1/B nylon webbing and tie-down strap?
Close the tensioning mechanism and pull the strap
Release the adjusting mechanism and pull the strap
Engage the release mechanism, and the strap automatically releases
Disengage the spindle mechanism, and the strap automatically releases
When moving a bomb on a forklift, what factor determines whether forklift spacers are required on the tines?
Personal preference
Weather conditions
Working environments
Forklift make and model
When you use the H1004 bomb-hoisting adapter to lift a bomb, how do you align the lifting eye?
With the hoist's center of gravity (CG)
By the weight capacity of the hoist
With the weapon's CG
By the average weight of all weapons lifted
What is the minimum number, if any, for wheeled pry bars to move warhead containers?
Wheeled pry bars are not authorized
Two
Three
Four
What loading procedure is not authorized on the MHU-141/M munitions handling trailer?
Single bombs in any location
Center position for a two bomb load of B83s
Center position for a two-bomb load of B61s
Bomb nose orientation to meet operational needs
The terms "in" and "out" referenced in the figures and tables of TO 11N-B1004-1, Weapons Loading and Tie-down Procedures, refer to the
Tie-down cable routing through or around bomb lugs
Inner and outer holes of the MHU-28/E adapter
Position of the chocks on the trailer deck rails
Position of the load binder handle
When can you load two single-bolstered B83s on the MHU-141/M munitions handling trailer?
For storage only
With major command (MAJCOM) approval
When performing maintenance on the bolster
For transportation within the weapon storage area (WSA)
During the bomb transfer operation, when do you attach the tie-down devices?
Before positioning the caster assemblies
After removing the lifting device
During the pre-use insepction
Before bomb loading
How do you transport the W80 warhead on a MHU-141/M munitions handling trailer?
By installing the MHU-71/E guided missile handling rail set
By opening the trailer deck and setting the W80 on the chocks
Tying down the MHU-69A/E handling cradles with CGU-1/B nylon webbing and tie-down strap
The W80 warhead cannot be transported on the MHU-141/M munitions handling trailer
When payloads are on the MHU-71/E guided missile handling rail sets, for safety you check to make sure
The lifting device is installed
All rail stops are extended
The quick-release pins are retracted
The cradle adapters are facing forwards
Which munitions handling trailer (MHT) selectable mode affects all four X-Y pads and provides 5 inches of movement during loading or unloading?
FORWARD/BACKWARD
FRONT LEFT/RIGHT
REAR LEFT/RIGHT
PITCH
What do you do after all the munitions handling trailer (MHT) operations are completed?
Attach tow bar
Drain the air tank
Release the lock pins
Chock the rear wheels of the trailer
{"name":"Rvrbrbrvrb", "url":"https://www.quiz-maker.com/QPREVIEW","txt":"Nuclear items are identified by the material management code, Which parts or components are funded, procured, and owned by the Air Force?, Which parts or components are furnished to the Air Force but remain the property of Department of Energy (DOE) regardless of custody?","img":"https://www.quiz-maker.com/3012/images/ogquiz.png"}